Free templates / Punch list
Construction punch list template
One page on US Letter with 18 numbered items. Each item has a location, a description, the responsible trade, a photo number, a due date, a status and a line for whoever verifies it on the back-punch.
A punch list closes fast when every item is specific, assigned to one trade and verified by someone who looked at it. This template is built around those three things. Print one per area or per floor so each trade gets a short list instead of the whole building.
How to fill it in
- One defect per line. Write the room number and the exact spot: "Rm 214, east wall behind door, 4 ft AFF."
- Describe what's wrong, not what to do: "drywall seam visible, approx. 18 in." rather than "fix wall."
- Assign one trade per item. If two trades are involved, split it into two items.
- Number your photos and write the number on the line, so the trade can find the spot.
- Use the three statuses. "Ready" means the trade says it's done; only "Closed" means someone verified it.
More detail in the guide: How to run a construction punch list.
Punch List
Items to complete or correct before closeout
Walkthrough attendees
| # | Name | Company / role | Initials |
|---|---|---|---|
| 1 | |||
| 2 | |||
| 3 |
Items
Status: O = open · R = ready for back-punch (trade reports done) · C = closed (verified) · Location: room no., wall or grid, height.
| # | Location | Description of item | Trade / sub | Photo no. | Due | Status | Verified by / date |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 | |||||||
| 3 | |||||||
| 4 | |||||||
| 5 | |||||||
| 6 | |||||||
| 7 | |||||||
| 8 | |||||||
| 9 | |||||||
| 10 | |||||||
| 11 | |||||||
| 12 | |||||||
| 13 | |||||||
| 14 | |||||||
| 15 | |||||||
| 16 | |||||||
| 17 | |||||||
| 18 |
Punch items with the photo attached
In Arazim Reports, punch items are grouped by location, each with photos, a description and a severity, and every version you send stays in the project archive.
Start free trial 14 days free, no credit card. Then $10/month for your first year.FAQ
What goes on a construction punch list?
Incomplete or defective work found near the end of the job, one item per line: location, description, responsible trade, photo reference, due date and status. Each item is closed only after it has been reinspected.
What do the status codes mean?
O is open. R means the trade reports the item complete and it is ready for back-punch. C means someone reinspected it and verified the correction.
Is this punch list template free?
Yes. Print it, save it as a PDF or type into the fields first. No sign-up is needed, and nothing you type is stored or sent anywhere.
Should warranty items go on the punch list?
Keep them separate. Punch items are found before or at substantial completion; defects found after the owner moves in are usually warranty items and belong on a separate list.
This template is a general working form. It does not replace the requirements of your contract, your building department or your firm's procedures. Adapt it to your project.