Your field report, done before you leave the site.
Arazim Reports turns your site notes and photos into a clean PDF on your own letterhead. Made for independent inspectors, engineers and small firms.
14 days free. No credit card required.
After the trial: $10/month for your first year, up to 80 new reports a month. Then $19/month, unlimited. Both apps included. Renews automatically until you cancel.
Observations
J. Harlow
How it works
Three steps, on your phone.
No templates to build and no forms to design. Open the app, walk the site, send the report.
Capture
Take photos, mark them up, and type or dictate what you see. Each item gets a location, a status and a photo.
Review
The writing assistant rewrites your notes in clear wording. You read every line and edit it before the report goes out.
Send
Export a PDF on your letterhead with your signature. The final version is saved to your project archive.
Reports
The reports you write every week.
The plan includes all report types. Structural report types are in early access. Check each structural report against your project requirements before you issue it.
Field Observation Report
Site visit record with attendees, work observed, photos, open items and distribution list.
Punch List
Items grouped by location, each with photos, a description and a severity. Cost column is optional.
Meeting Minutes
Attendees, discussion, decisions and action items with an owner and a due date.
Structural Observation Letter
Written record of a structural observation visit by the registered design professional.
Pre-Pour Inspection
Reinforcement, formwork, embeds, cover and cleanliness, recorded before the concrete pour.
Project management
Schedules, site diaries and consultant coordination. A separate product, planned for a later release.
Why Arazim Reports
Built for one person with a phone, not a project office.
Your name on the report
Your logo, contact details, license number and signature appear on every page. Our name appears only as a small credit line.
No seat minimums
One user, billed monthly. There is no annual contract and no three-seat minimum.
An archive you can search
Reports are filed by project. Each final version is kept, so you can find what you sent and when.
Sign in and pay the easy way
Sign in with Google. Pay by card, Apple Pay, Google Pay or PayPal.
Who we are
Made by an engineering firm, for our own field work.
Arazim Engineering is a practicing engineering and construction supervision firm based in Israel. We built these tools because we write site reports every week, and we use them on our own projects.
What the software does not do
- It does not make engineering decisions.
- It does not add findings, dimensions or code references you did not enter.
- It does not mark anything as acceptable by default. You choose every conclusion.
The licensed professional is responsible for the content of each report.
Pricing
$10 a month for your first year.
Up to 80 new reports a month. Then $19 a month, unlimited. Both apps included. Renews automatically until you cancel. Extra users are $12 each per month.
Questions
Before you sign up
Can I use it today?
Yes. Create an account with your email or with Google and start a 14-day free trial. No credit card required. The trial includes up to 7 field reports and 7 structural reports.
What happens after the first 12 months?
Your plan renews at the regular price, $19 a month, with unlimited reports. We email you at least 14 days before the price changes, with the new price, the date and a link to cancel.
How do I cancel?
In your account settings, in one step. You keep access until the end of the period you paid for, and you can download your reports.
Can I sign and seal a report?
Your signature image is placed on the PDF. If a document needs a professional seal or a certified digital signature, export the PDF and sign it in your own software. Requirements differ by state and by building department.
Does it work without a connection?
You need an internet connection. The app tells you clearly when something has not been saved yet.
Where is my data stored?
Reports and photos are stored in a data center in the United States. Text you send to the writing assistant is processed by our AI providers. See the Privacy Policy.
Get started
Write your next field report with Arazim Reports
Sign up with your email or with Google. 14 days free. No credit card required.